Urban News

  • Increase font size
  • Default font size
  • Decrease font size

Water adalat held in Malleswaram

Print PDF

The Times of India               14.12.2013

Water adalat held in Malleswaram

BANGALORE: Bangalore Water Supply and Sewerage Board (BWSSB) held water adalat of North East-2 sub division on Friday, December 13, 2013 in the office of the assistant executive engineer Malleshwaram. The meet was to settle the grievances connected to water billing, delay in giving water supply and sanitary connection, delay in conversion from non domestic to domestic connection and other related issues.

The disputes of customers of Kempegowda Tower, Kumar Park, Jayamahal, service station of North East-2 Sub division were held and settled at the Adalat. To clarify doubts, customers may contact telephone numbers of executive engineer North 22945124. Assistant executive engineer of North East-2 22945135 sub-division For details may contact BWSSB 24/7 call centre No 22238888.

Also, the water board held a grievance meet will be held on on the same day Coles PArk, HAL 2nd Stage and Devagiri sub divisions. Assistant Executive Engineer, Assistant Engineer, Water Inspector and Meter Reader of the sub Division attended the grievances related to water and sanitary problems.

Last Updated on Saturday, 14 December 2013 11:34