Urban News

  • Increase font size
  • Default font size
  • Decrease font size
Tamil Nadu News Papers

Pallikaranai marsh turns dumpyard

E-mail Print PDF

The New Indian Express 09.12.2009

Pallikaranai marsh turns dumpyard


Cows grazing in the midst of smoke from burning of garbage in the Pallikaranai marsh.
CHENNAI: Pallikaranai marsh, a bio-diverse ecosystem that houses 106 species of birds, 46 species of fishes and 29 species of grass, has turned out to be a garbage disposal site for south Chennai, as the civic body’s dumpyard has been eating into the land for the past few years.

The marsh that originally covered an area of 5000 hectares had shrunk into 593 by 2002. On the other hand, the corporation’s dumpyard that was 56 hectares in 2002 had gobbled up a sprawling 136 acres in 2007 and is on constant expansion. Over 4,500 metric tones of garbage are dumped here from south Chennai every day. Besides, lorries from other parts of the city drop industrial waste in a heap along the water bodies.

A national level study on the Wetlands of Tamil Nadu under the Ministry of Forest and Environment in 2002 stated that there was a 90 per cent loss of habitats. The study attributed the loss to ‘Purpose determined by the State’.

“Though the ground water level is high, the water cannot be used due to its bitterness,” Ramachandran, a resident of Pallikaranai lamented. Also several studies found considerable levels of mercury and cadmium in the water.

After a wave of protests in 2007, the government designated 317 hectares of the marsh in the southern part as a reserve forest under the Forest Act. But no efforts on conservation have been made and things are getting worse day-by-day, locals say.

This dumpyard was originally allotted 19 acres in Sevaram village at Perungkudi in 1970. By mid 1980, the area was completely filled up and then the corporation shifted to the present location in Pallikaranai.

Jayshree Vencatesan, who was part of the study on the wetlands and managing trustee of an NGO, Care Earth, which has been striving to save the marsh said, “The Chennai Corporation without any directive from the State government shifted from Sevaram village to the Pallikaranai marsh. Solid waste is being dumped all around and no segregation of garbage happens here. Further, the burning of waste causes pollution.”

Vencatesan harbours fear that this marsh will soon become history if the government continues to turn blind eye to it. As construction is fast catching up in Velachery, Perungudi and Thoraipakkam along the OMR stretch, the real estate sharks are eyeing this precious ecosystem, which is designated as ‘wasteland or poramboke’ in the revenue classification. “These wetlands being classified as wastelands makes it convenient for the realtors to get land pattas.”

A Pallikaranai protection committee comprising government stakeholders submitted a report to the civic body three months ago suggesting shifting of the dumpyard.

Last Updated on Wednesday, 09 December 2009 08:19
 

Stalin kicks off Cooum project

E-mail Print PDF

The New Indian Express 09.12.2009

Stalin kicks off Cooum project




CHENNAI: With the Public Works Department handing over about one kilometre stretch of Cooum River bank between Anderson Bridge and Harris Road Bridge near Chintadripet, the river’s restoration project officially began on Tuesday.

Speaking to reporters after launching the first phase of Rs 1200 crore restoration project, Deputy Chief Minister M K Stalin said, “For the restoration of such polluted 12-km river in Singapore, the local government took about 10 years’ time, though Cooum is 18 km long (inside city limit), we also want to complete the whole project in 10 years period.”

In the one-km stretch handed over to the Chennai Corporation on Tuesday, the civic body would develop vast play area for children, besides green meadows and footpaths, Stalin said.

If we remove all encroachments along the banks of Cooum river and arrest sewage inflow to the river basin, the restoration project would be over by 50 per cent, Stalin asserted.

In the first phase, restoration project would be carried out in 18-km stretch falling inside the city limit. Stalin said, “Under Rs 600 crore package received by the Chennai Corporation for various projects from the Jawaharlal Nehru National Urban Renewal Mission, Rs 200 crore would be used for laying new storm water drains (SWDs), Rs 117 crore would be used to upgrade the existing SWDs and another Rs 200 crore would be used for strengthening Cooum bunds.”

He also announced that a new monitoring committee under the leadership of the Chief Secretary and comprising other officials concerned would be formed soon to oversee the Cooum restoration project periodically.

On a question about initiative for restoration of other waterways crisscrossing the city, Stalin said, “Once the restoration of Cooum is done, a decision regarding cleaning and restoring of Adyar River and Buckingham Canal would be taken.”

Last Updated on Wednesday, 09 December 2009 08:13
 

Task force, panels to help clean up Cooum in 10 yrs

E-mail Print PDF

Deccan Chronicle 09.12.2009

Task force, panels to help clean up Cooum in 10 yrs

December 9th, 2009
By Our Correspondent

Dec. 8: Preliminary works for the Cooum river restoration project began on Tuesday with the public works department (PWD) handing over a stretch of Cooum riverbank to Chennai corporation for developing an eco-park near Chintadripet between Anderson causeway and Haris road bridge.

Inaugurating the function, deputy chief minister M.K. Stalin said under the first phase, Rs 1,200 crore would be spent for restoring the 72 km river. “We will form special task force and committees to ensure that the project is completed within a span of 10 years,” Mr Stalin said.

The Tamil Nadu government will accord top priority to the revival of the highly polluted Cooum that flows through Chennai and Tiruvallur. As a first step, encroachments will be removed and the affected rehabilitated, he said.

Removing the encroachments and arresting sewer inflow would be 50 per cent of the work and the remaining will include beautification. The Chennai River Authority, formed on the chief minister’s direction, will periodically review the progress of the project.

In the one-km stretch handed over to the corporation, it would develop play area for children, a lawn and footpaths, said Mr Stalin. Chennai mayor M Subramanian, deputy chief minister’s secretary Dheenabandhu, corporation commissioner Rajesh Lakhoni and PWD officials were present.

 


Page 1366 of 1640