Urban News

  • Increase font size
  • Default font size
  • Decrease font size
Tamil Nadu News Papers

New flyover to come up near Hosur

E-mail Print PDF

The Hindu                14.12.2013

New flyover to come up near Hosur

Dharmapuri District Collector K. Vivekanandan receiving a shield from Chief Minister Jayalalithaa for the efforts taken to eradicate child labour in the district in 2011, at the concluding day of the conference of District Collectors and police officials in Chennai.
Dharmapuri District Collector K. Vivekanandan receiving a shield from Chief Minister Jayalalithaa for the efforts taken to eradicate child labour in the district in 2011, at the concluding day of the conference of District Collectors and police officials in Chennai.

Chief Minister Jayalalithaa has announced a new flyover across the South Pennar River in Pathakottai village, near Hosur.

At the end of a three-day conference of District Collectors and police officials on Friday, the Chief Minister made the following announcements for Krishangiri and Dharmapuri districts: a new barrack for Hosur and new buildings for Shoolagiri Police Station and Uthangarai Sub Divisional Office.

A new building for Krishnagiri Taluk Office, a new Backward Class College Girls’ Hostel in Hosur, Krishnagiri towns, new Adi Dravidar College Girls’ Hostel in Krishnagiri, and a new Adi Dravidar Girls Hostel in Thalli in Krishnagiri district were announced by the Chief Minister.

The Chief Minister announced that the post of Taluk Supply Officer in Hosur would be upgraded to tahsildar.

The Chief Minister announced Phase II of the Underground Sewerage System for 14 Wards in Dharmapuri Municipality at a cost of Rs. 55-crore. A canal would be constructed for diverting surplus flood water to Senganbasuvanthalav Tank from Chinnar River to feed ten tanks in Palacode Taluk at a cost of Rs. 1.65 crore. A new canal would be constructed to divert flood water from Bettamugilalam Pallam to Kesergulihalla Reservoir in Palacode taluk at a cost of Rs. 58 lakh.

 

Amma Canteen awaits fuel from biogas plant

E-mail Print PDF

The Hindu                14.12.2013

Amma Canteen awaits fuel from biogas plant

Defunct:The biogas plant constructed by the Coimbatore Corporation near the Amma Canteen in Saravanampatti is not put to use.- PHOTO: S. SIVA SARAVANAN
Defunct:The biogas plant constructed by the Coimbatore Corporation near the Amma Canteen in Saravanampatti is not put to use.- PHOTO: S. SIVA SARAVANAN

At the Saravanampatty Amma Canteen, the breakfast gets exhausted in time and so does the lunch. The canteen managers prepare 1,200 idlis for breakfast and 300 plates each of sambar rice and curd rice for lunch everyday.

A day’s cooking requires a liquefied petroleum gas (LPG) cylinder – commercial cylinder that weighs a little over 19.50 kg and costs nearly Rs. 1,000. Alongside the fuel, the Corporation needs 20 kg boiled rice, eight kg raw rice, six kg urad dal, six kg toor dal, a litre of oil among other things for the breakfast.

It also spends 38 kg boiled rice, eight kg toor dal, two litres of oil, 15 litre curd among other things for lunch. The civic body supplies the breakfast and lunch at a subsidised price.

To cut cost and to put to better use the waste generated from the canteen, the Corporation built a biogas generation plant that will generate methane gas from the vegetable and food waste from the canteen to fire the stoves.

It also designed the plant in such a way the biogas plant also takes in the waste from restaurants from in the neighbourhood.

According to sources, the biogas plant can take in nearly 500 kg waste a day and generate 15 – 17 kg methane.

The Corporation has spent Rs. 10 lakh towards building the plant.

But no fuel has been generated to date though the construction was completed sometime ago.

The sources say that though the Corporation has been dumping vegetable waste and food waste and gas gets generated there is inadequate pressure to convey the gas to the kitchen.

While visiting the biogas plant a couple of months ago, the Corporation Commissioner G. Latha had said that the Corporation would explore possibilities of setting up such plants at a few other places.

But with problems in the Saravanampatty biogas plant, the Corporation is keen on setting right things before it can build such plants elsewhere in the city, the sources add.

 

CMDA seals building owned by Reliance Industries

E-mail Print PDF

News Today              13.12.2013

CMDA seals building owned by Reliance Industries

 

 

 

 

Chennai: The building believed to be owned by Mukesh Ambani-led Reliance Industries Ltd in the city was sealed by the CMDA officials for alleged violations, sources said.   

The building, suitable for the use of Information Technology purpose owned by Hotel Leelaventures, was bought for about Rs 170 crore by Reliance Industries Ltd early this year. Leela Businesspark is part of the six acre land at MRC Nagar in city, also has the famous 11-storeyed hotel The Leela Palace equipped with 326 rooms and suites. As part of CMDA's efforts to check unauthorised construction, in the form of locking and sealing, under Section 56 and 57 of Town and Country Planning Act, 1971, against the building, action to lock and seal the premises bearing R.S. No.4288/113 and 115 in Block No.94 of Mylapore village, Chennai has been done", Chennai Metropolitan Development Authority said in a statement.    

Listing out the reasons for the sealing the property, it said, "the owner had obtained planning permission on May 6, 2010 from CMDA for the construction of triple basement floor + stilt floor, IT building. But, they had completed triple basement floot+ground floor + 13 floors + 14th floor (part) multi-storeyed Information Technology building with deviations/violations".    

"Even after giving sufficient time and opportunity, the owner has not rectified the deviations/violations to comply with the approved plan.Hence, a locking and sealing and removal of unauthorised development notice was issued on December four", it said.

Owing the owner did not comply with the notice, the entire building is locked and sealed on December 10, it said.

 


Page 256 of 1640